Construction Scheduling Software for Home Builders | Ressio
Construction Scheduling Software
Build schedules your team can actually follow
Plan the job, adjust dates when work shifts, and keep everyone aligned on what’s happening next.
Book a demo See how it works ↓
Schedule04/16/2026Toggle task view
| WBS | % Done | Name | Description | Start | Finish | Duration |
|---|---|---|---|---|---|---|
| 1 | 0 | PreConstruction | — | Apr 16, 2026 | Oct 1, 2026 | 118 days |
| 1.1 | 100% | •Design Deposit | — | Apr 16, 2026 | Apr 16, 2026 | 1 day |
| 1.2 | 100% | •Customer purchase water meter | — | Apr 17, 2026 | Apr 17, 2026 | 1 day |
| 1.3 | 0 | •Architectural revisions | Revise per HOA | Jul 1, 2026 | Aug 11, 2026 | 30 days |
| 1.4 | 0 | •Selections meeting with vendors | — | Apr 20, 2026 | Jun 1, 2026 | 30 days |
| 1.5 | 0 | •Site plan design | — | Apr 24, 2026 | May 7, 2026 | 10 days |
| 1.6 | 0 | •Site plan review and approval | — | May 8, 2026 | May 8, 2026 | 1 day |
| 1.7 | 0 | •Stake lot | Critical | May 13, 2026 | May 13, 2026 | 1 day |
| 1.8 | 0 | •Apply for septic permit | — | May 14, 2026 | May 14, 2026 | 1 day |
| 1.9 | 0 | •County Septic Review | — | May 15, 2026 | Jun 9, 2026 | 17 days |
Scheduling built for how custom builds actually run
Not a generic Gantt chart. A scheduling system that understands phases, dependencies, subs, and clients — and keeps them all in sync.
List view and Gantt chart — side by side
Build your schedule in the list view where editing is fast, then slide to the Gantt chart to see the full timeline. Both views update in real time. No toggling, no exporting, no reconciling two different screens.
- Drag the center divider to adjust your split layout
- Edit inline in the list — double-click any cell
- Zoom from daily to yearly view on the Gantt
- Expand or collapse phases at any level
Change one date. Everything else adjusts.
When a task moves, every downstream task automatically reschedules. No manually cascading changes through a spreadsheet. No calling every sub to relay updated dates. Ressio handles the ripple effect so you don't have to.
- Finish-to-Start, Start-to-Start, Finish-to-Finish dependencies
- Add lag or lead time between tasks (e.g. let concrete cure before framing)
- Red tab indicator shows exactly where the last change was made
- Undo / redo — step back through changes with Ctrl+Z
Critical path and baseline — know what a delay actually costs
Not every task is equal. Enable critical path view to see which tasks directly affect your completion date — and focus your attention where it matters. Set a baseline to capture your original plan, then compare against it as the job evolves.
- Critical path highlights highest-risk tasks in one click
- Baseline snapshot saved at any point in the project
- Compare planned vs. actual timeline visually on the Gantt
- Constraint dates prevent tasks from slipping past hard deadlines
Share tasks with clients and subs — without sharing everything
Selectively show clients and subs exactly what they need to see. Clients get visibility into their project timeline without seeing internal notes or financials. Subs get task notifications with a magic link — no login required.
- Assign phases and tasks individually or share the full schedule
- Magic link notifications — subs tap and see their tasks instantly
- Vendors can confirm task acceptance directly from the notification
- Public and private files and notes at the task level
Frequently asked questions
How does Ressio scheduling work?
Ressio's schedule is a connected List + Gantt view built specifically for custom builders and remodelers. You build tasks, phases, and milestones, link them with dependencies, and assign them to team members, subs, or clients. When any task date changes, all downstream tasks update automatically. You can set a baseline, track critical path, and share the schedule with clients via magic link — no login required.
Does Ressio scheduling sync with Google Calendar or Outlook?
Yes. You can subscribe your Ressio schedule to Google Calendar or Microsoft Outlook so tasks appear on your external calendar automatically. Any schedule changes in Ressio are reflected in your calendar in real time.
Can I share my schedule with clients without showing everything?
Yes. You control exactly what clients see. You can share selected phases and tasks, or the full schedule — and clients access it via a magic link without needing a login. Internal notes and private files remain hidden from clients.
Can subcontractors see and confirm their tasks in Ressio?
Yes. You can assign subs to tasks and send them a notification with a magic link. Subs can view their assigned tasks, confirm acceptance, and communicate directly on the task — without needing a Ressio account or login.
What's the difference between List view and Gantt view in Ressio?
Both views display your full schedule and can be used simultaneously. The List view is a spreadsheet-style layout best for building and editing tasks quickly. The Gantt view shows your timeline visually with dependencies and phases. You can drag the divider to use both at once, or go full-screen in either view.
Does Ressio have critical path scheduling?
Yes. Enable the critical path toggle in List view to highlight tasks that directly impact your project completion date. Critical path requires predecessor/successor dependencies to be set on your tasks.
Can I use schedule templates in Ressio?
Yes. You can create reusable schedule templates and apply them to new projects instantly. You can also copy a schedule from an existing Ressio project. Templates can only be applied to blank schedules, so start fresh before inserting.
Does Ressio scheduling work on mobile?
Yes. The schedule is fully accessible on mobile via the Task view, which lets you sort by phase, status, date, or assignee, update task status, view and send messages, and upload files or photos — all from your phone in the field.